Shingle Roof Installation & Replacement Contractors In New York
Request An Estimate

About Our Shingle Roof Installation & Replacement Services
Everything here starts with reading the old roof, because its findings decide the scope before any material is chosen. Read in order, a shingle roof reports itself: courses curling, cracking or shedding their granule surface; fasteners working proud; flashing at chimneys, walls and valleys at the end of its detailing; soft spots underfoot where the deck has taken water; and the layers already stacked beneath this one. Each finding moves the answer: a sound deck under failed courses is a straightforward replacement, damaged decking changes the scope beneath the courses, and one deteriorated slope beside sound ones opens the honest partial-scope conversation a replacement-only process never has.
The installation follows the assembly’s own order. Tear-off goes to the deck — the old covering and underlayment stripped so the deck can be inspected whole, with anything rotten or soft reported, photographed and scoped in writing before it is covered again. Then the build: deck repaired to sound material, ice-and-water protection at eaves and valleys where exposure demands it, underlayment across the field, shingle courses laid so water always meets a lap and never a gap, and valley, ridge and junction flashing integrated as the courses reach them — flashing as a standalone discipline is carried at depth within our roofing repair and installation programme. Ventilation is corrected where the old roof’s failure implicates it, because a hot, undried roof space shortens the life of whatever is laid over it. Flat sections beside the pitched slopes are scoped on our flat roof installation and repair page, and the tie-in is named on both.
What Is Shingle Roof Installation & Replacement?
A shingle roof is a water-shedding assembly, not a waterproof one. Thousands of overlapping courses, each lapped over the one below, persuade water to keep moving downhill from ridge to eave, surface to surface, never meeting a gap it can enter. Nothing in the field is sealed against standing water — the system works by overlap and gravity, which is why its details matter more than its materials: a valley lined wrong, a flashing course out of sequence, a fastener placed where the lap above does not cover it, and the assembly leaks at that one point however sound the rest of the field is.
Replacement, properly understood, is rebuilding that whole assembly — not laying a fresh face over a tired one. The old roof’s failures live in its layers: in the deck that has softened, the underlayment that has perished, the flashing that was bent rather than renewed last time. Strip to the deck and each of those is exposed, decided and rebuilt in order; cover over them and they are inherited, hidden, by the new roof. Installation on new work and additions runs the same assembly from a bare deck — the discipline is identical, only the tear-off is missing.
- Our Services
Types Of Services We Offer
Shingle Roof Installation & Replacement
The full system build on one page: tear-off to sound deck, protection and underlayment, courses, flashing and ventilation installed as one assembly.
Full Shingle Roof Replacement
The whole assembly rebuilt where the evidence is general — curling, granule loss and leaks across slopes — stripped to the deck and renewed layer by layer in order.
Shingle Installation On New Work & Additions
The same assembly built from a bare deck on new construction and additions, with tie-ins to the existing roof detailed so old and new shed water as one plane.
Partial-Slope & Section Replacement
One failed slope or one damaged section replaced on its own evidence, matched into the sound slopes around it — the honest partial scope, where the rest of the roof genuinely has life in its assembly.
Tear-Off & Deck Inspection
Old layers stripped to the deck, the deck inspected across its whole area, and anything rotten or soft reported and scoped in writing before it is covered again.
Ice Protection, Underlayment & Ventilation
The layers that decide the assembly: ice-and-water protection at eaves and valleys where exposure demands it, underlayment across the field, and ventilation corrected where the old failure implicates it.
Roof Leak Diagnosis & Repair
A shingle roof whose leak cause is still in question is traced first — the entry point found by method — and the repair-versus-replacement call made on that evidence.
Flat Roof Installation & Repair
Houses with flat sections beside their pitched slopes — rear extensions, dormers, porches — have those fields scoped on our flat roof page, with the tie-in named on both.
Searching for Shingle Roof Installation & Replacement Contractors Near Me?
If you are searching for shingle roof contractors near you in New York, the useful question is who replaces the system — deck, protection, courses, flashing, ventilation — rather than selling you a surface. RT General Construction Inc is based in Yonkers and installs and replaces shingle roofs across Westchester County, the Bronx, Manhattan and Queens — houses first, and the pitched roofs of small buildings, where the owner deals with one contractor for the assessment, the written scope and the work itself. Every roof is assessed in person, slope by slope, and the written scope separates what the whole roof needs from what one slope needs, so a partial scope is never dressed up as a full replacement — or the other way round. A leak on a shingle roof whose cause is still in question is traced first, on our roof leak diagnosis and repair page, and the wider programme sits within our roofing repair and installation service. Call us or send the form on this page to arrange a free estimate at your property.

- Why Choose Us
The Whole Assembly Replaced — Or Honestly, Just One Slope
Shingle roofs are usually sold as a surface: new courses over whatever the old roof is hiding. Ours is sold as an assembly. The old roof is read slope by slope; tear-off exposes the deck and every finding on it is reported in writing before it is covered; protection, underlayment, courses, flashing and ventilation go back in the assembly’s own order. And the scope stays honest in both directions — a full replacement where the failure is general, a partial slope where it is not, each call shown to you as evidence first.
- Slope-By-Slope Reading Before Scope
- Tear-Off To Sound Deck As Standard
- Deck Findings Reported While The Roof Is Open
- Partial Scopes Offered Where They Are Honest
- Categories Explained, Brands Never Sold
- Ventilation Corrected With The Assembly
Nothing Is Buried Silently
Rotten decking found mid-job is marked, photographed and scoped in writing with you before the build proceeds — never discovered later as a surprise line.
The Roof-Over Is Argued, Not Sold
Where covering over is genuinely defensible we say why, in narrow stated conditions. Everywhere else, the strip-and-report discipline is the scope you get.
One Contractor Above And Below The Roof
The gutters at the eave, the chimney through the field and the ceilings beneath the leak sit within our own scopes — the roof is never handed off mid-job.
- Our Process
Process, How we Works.
01
Curling, Cracking And Granules In The Gutters
The courses reporting age: shingles that curl or crack have lost the flexibility the laps depend on, and granule loss — the grit collecting in gutters and at downspout bases — is the surface itself wearing away.
02
Leaks Recurring In Different Places
One leak is a detail; leaks appearing slope after slope are the assembly reporting generally — courses, underlayment and flashing failing together, which is replacement evidence, not repair evidence.
03
Soft Spots And A Wavy Roofline
The deck speaking through the courses: softness underfoot or a sagging, uneven plane means the material beneath the covering has taken water, and no new surface laid over it will sit straight or hold.
04
One Slope Far Worse Than The Others
The sun-facing or weather-facing slope ages ahead of the rest. Read honestly, it can mean a partial-slope scope is the right one — or the first report of a roof failing in sequence. The other slopes’ condition decides which.
- Benefits
Benefits Of Hiring Us In New York
A shingle roof is judged by the winters it sheds. Here is what a system-build replacement gets you.
The Whole Assembly, Rebuilt In Order
Deck, protection, underlayment, courses, flashing and ventilation handled as one system, so no layer of the new roof is laid over the old roof’s weaknesses.
Deck Findings Reported, Never Buried
What tear-off exposes is shown to you and scoped in writing before it is covered — the rotten-boarding surprise, removed from the job entirely.
Whole Roof Or One Slope, Told Straight
Where a partial scope is genuinely enough, that is the scope you get. Where the failure is general, you see the slope-by-slope evidence before a full replacement is priced.
Materials By Category And Behaviour
Shingle categories explained by how they perform — weight, profile, exposure — and chosen for your roof, with no brand programme standing in for an argument.
- Our Projects
Proven Quality, Best Results
- Testimonials
Built on Trust, Proven By Testimonials
98% Clients Are Positive Reviews 1 2
- Our Faq
Clear Answers to Your Construction Questions
What Does Shingle Roof Installation Or Replacement Cost In New York?
Cost turns on the roof’s size, pitch and complexity — a simple gable and a cut-up roof of valleys, dormers and junctions are different work — on how many existing layers must be torn off, on the deck repairs the tear-off finds, on the shingle category selected, on the flashing and ventilation scope the junctions need, and on access and disposal logistics at the property. Those factors are why a responsible figure follows an assessment rather than preceding it. We assess in person, slope by slope, and price the written scope element by element.
How Do I Know My Shingle Roof Needs Replacement Rather Than Repair?
Read the pattern, not the single symptom. A localised failure — storm-lifted courses on one slope, one failed flashing detail, damage from one event — over a field that is otherwise flat, sealed and shedding water is a repair. Replacement evidence looks different: curling or cracking across slopes, heavy granule loss, leaks recurring in different places, soft decking, or several layers already stacked under the present one. Where the cause of a particular leak is still in question, it is traced first — that discipline lives on our roof leak diagnosis and repair page — and the repair-versus-replacement call is made on the whole roof’s evidence, not on the leak alone.
Do You Tear Off The Old Roof, Or Go Over It?
Tear-off to sound deck is our standard, for a plain reason: it is the only way to see the deck, the old underlayment failures and the true layer count before the new assembly covers them. A roof-over — new courses laid over old — hides every one of those, adds the old roof’s unevenness and weight to the new one, and makes the next roof’s tear-off heavier. We scope a roof-over only in narrow conditions: a single existing layer, lying flat, over a deck verified sound, where the owner understands exactly what is being traded away — and we state those conditions in writing rather than selling the shortcut as the default.
How Long Does A Shingle Roof Last?
We answer with factors, not a figure, because a lifespan printed in a sales page is a promise dressed as information. What actually decides it: the shingle category and its weight and profile; the ventilation of the roof space beneath it — a hot, undried assembly ages its own covering; the exposure the slopes take, sun and weather side first; the detailing at valleys, junctions and penetrations, where failures begin; and whether small failures are repaired early. Your written scope records the assembly that was built, layer by layer — the part of the answer that is ours to stand behind.
What Happens If Rotten Decking Is Found During Tear-Off?
It is reported before it is covered — that is the whole discipline. Tear-off exposes the deck across its full area; any section that is rotten, soft or delaminated is shown to you, the extent is marked, and the replacement of those sections is scoped in writing as its own element before the build proceeds over it. Decking is replaced like-for-like in sound material, tied into the sound deck around it. No deck finding is buried silently under new underlayment, and no figure for it appears afterwards as a surprise — the sequence is agreed while the roof is open, which is the only honest time to agree it.
- Services Areas
Proudly Serving Across New York
From interior renovations to exterior restoration, RT General Construction Inc delivers dependable construction and remodeling solutions for residential and commercial properties across New York. Our team handles everything from masonry, concrete, roofing, and exterior repairs to kitchens, bathrooms, painting, and interior improvements.
- New York
- Jerome Park, NY
- Village of Pelham, NY
- Harlem, NY
- Eastchester, NY
- North Side, NY
- Yonkers, NY
- New Rochelle, NY
- Pelham Manor, NY
- Mamaroneck, NY
- Larchmont, NY
- Tuckahoe, NY
- Hastings-on-Hudson, NY
- Scarsdale, NY
- Bronxville, NY
- White Plains, NY
- Manhattan, NY
- Astoria, NY
- Long Island City, NY
- Fresh Meadows, NY
- Flushing, NY
- Bayside, NY
- Queens, NY
Let's Build Something Amazing Together
Tell us about your project and we will arrange an assessment, explain what the work involves and provide a written scope before anything begins. One contractor, one plan, one accountable team — that is how RT General Construction Inc runs every job, large or small.